变电站构支架招标技术文件-专用部分
国家电网公司集中规模招标采购
招标文件
西藏电网建设管理分公司 纳木错至班戈110kV 输变电工程
青龙变电站构支架 专用技术规范
设计单位:甘肃聚贤电力工程设计有限公司西藏分公司
2011年8月
目 次
1 货物需求一览表 ····································································································································· 3 2 供货范围一览表 ····································································································································· 3 3 工程概况 ················································································································································ 3 4 合同结算重量 ········································································································································ 4 5 原材料要求 ············································································································································ 4 6 技术差异表 ············································································································································ 4 附录A 技术规范通用部分条款变更表 ····································································································· 5
1 货物需求一览表
货物需求一览表
2 供货范围一览表
供货范围一览表(投标人填写)
3 工程概况
本招标文件适用于 110KV 变电站工程所需构、支架的制造、试验、检验、包装、运输等。
工 程 概 况 表
4 合同结算重量
变电站构、支架招标重量为施工图重量(或初步设计估算重量),该重量中未考虑螺栓安装损耗、备用垫圈等因素引起的采购重量增加。合同签订采购重量以设计图纸重量为准,合同结算重量以竣工图中重量为准。 5 原材料要求
5.1 本变电站构、支架所采用的原材料均应满足相应标准、规范、施工图以及技术规范通用部分的要求,并须有质量证明书。
5.2 对于建设在严寒地区的变电站工程,投标人应根据本工程技术文件或施工图的要求,在材料采购、选择和制造中使用防低温脆断钢种和焊接材料,并进行相应的焊接工艺评定。 6 技术差异表
投标人提供的产品技术规范应与本招标文件(含技术规范通用部分)中规定的要求一致。若有差异投标人应如实、认真地填写差异值;若无技术差异则视为完全满足本技术规范的要求,且在技术差异表中填写“无差异”。
技 术 差 异 表
附 录 A
技术规范通用部分条款变更表
注 本表是对技术规范通用部分的补充和修改,如有冲突,应以本表为准。