空心板梁模板施工技术的研究
·206·
价值工程
空心板梁模板施工技术的研究
Construction Technology Study on Hollow Plate and Beam Model
陈保家Chen Baojia
(温岭佳合房地产开发有限公司,温岭317500)
(Wenling Jiahe Real Estate Development Co. ,Ltd. ,Wenling 317500,China )
摘要:后张法预应力混凝土空心板梁是预应力混凝土简支梁桥和先简支后连续桥中常用的结构形式之一,它具有自重轻、抗震抗裂性能
好、稳定性高、梁高较低、预制架设方便等特点。随着我国高等级建筑建设的不断发展,预制预应力混凝土桥梁日益显示出广阔的应用前景。
Abstract:Post-tensioned prestressed concrete hollow slab is the common structure form in supported prestressed concrete girder bridge and the simply supported continuous bridge, it has the characteristics of light weight, seismic crack resistance, high stability, low beam height, convenient pre-set. As the constant development of high-grade building construction, precast prestressed concrete bridge increasingly shows application prospects.
关键词:后张法;预应力;混凝土;空心板梁
Key words:post-tensioned; prestressed; concrete; hollow beam
中图分类号:TU74
文献标识码:A
文章编号:1006-4311(2010)03-0206-02
1后张法预应力空心板梁施工(3)芯模:预制时采取切实可行的措施固定芯模位置,确保空心
后张法预应力混凝土空心板梁预制的主要施工工序包括:模板板梁内部构造尺寸的准确性。施工、钢筋加工、波纹管安装、混凝土浇筑、力筋张拉、孔道压浆、封3钢筋加工及波纹管安装锚等。本章节数据均以下章节20m 静载试验的预应力空心板梁(以钢筋加工与安装应严格按照设计和施工规范施工,并应注意预下简称试验梁)为例,长宽高几何尺寸20m ×1.24m ×0.90m ,斜交20°,埋件位置、数量等,防止遗漏。预应力波纹管埋设以底模为基准,按构造如图1所示。预应力钢绞线曲线坐标直接量出相应点的高度,标在箍筋上定出波
纹管曲线位置,然后将波纹管准确就位并绑扎牢固。波纹管预留孔道多采用内径为55mm 或70mm 波纹管,波纹管定位筋采用直径8毫米“井”型钢筋点焊在骨架上,间距80cm 。并且尽可能减少接头,以免穿钢绞线时因接头过多而穿束困难,有条件就地生产成整体的波纹管为最好。
锚垫板按照图纸位置准确固定在端模上,波纹管穿入锚垫板孔道,并用胶布缠绑,防止滑脱。施工中应特别注意应使端头锚垫板与波纹管孔道中心线保持垂直,以减少孔道与端的摩阻力。后张空心板梁钢束多数采用先穿法,即在浇筑混凝土之前把钢绞线穿入波纹管中,施工方便,成孔质量易得到保证,不会出现瞎孔现象。
4混凝土浇筑
混凝土采用商品混凝土或由带有电子计量自动配料系统的混凝土拌合站负责供应,用混凝土搅拌运输运送,用门吊结合料斗的
图120m 空心板梁构造图方法进行浇筑。工地配备必要的试验仪器,跟踪试验,随时对混凝土
2模板施工质量进行检查和监控。图1试验梁混凝土强度等级C40,根据采购预应力空心板梁的模板工程包括底模、外模(包括侧模和端模)的水泥、砂、石子经试验得最佳配合比如表1所示。和芯模。表1C40混凝土配合比表(kg/m3)
(1)底模水泥砂石子水外掺剂水灰比
P.O425Ⅱ类中砂碎石(5-20mm )饮用水FDN-A —在压路机碾压好的预制场上用碎石打底,用水准仪精确找平
[1**********]634.790.34后,然后做C25砼面层,并外衬角钢。底模要求线条直顺,表面光滑,
易于脱模;两端坚固,不易因为张拉梁体起拱受荷而下沉。同时为保混凝土一次性浇筑完成,先底板后梁体。在浇筑底板时控制好证预制梁在张拉起拱后支座有足够的承载力对支座部位进行加固。底板厚度。芯模两侧同时下料,振捣时每一处振捣结束后边应边缓如图1中的底模尺寸建议为(0.5+20+0.5)m×1.24m ×0.08m ,两加固端缓提出振动棒,应避免振动棒碰撞模板、钢筋和波纹管等。插入式振浇筑1.0m ×1.24m ×0.24m 钢筋砼横梁。一部分后张法预制梁在砼底捣要布点均匀,防止因振捣不当而使芯模上浮、变形。对每一振动部模支座处还要留有不同尺寸的梁底楔块, 以满足桥梁纵向横向调坡位,必须震动到该部位硅密实为止,不漏振。密实的标志是砼停止下需要, 及保证相邻梁底不出现高低错缝。沉,不再冒出气泡,表面呈现平坦、翻浆。振捣时振捣棒应避开波纹
(2)侧模和端模:采用定型钢模板,模板厚4mm ,骨架保证有足管,以防止波纹管移位和振坏产生漏浆堵塞。预应力钢绞线锚固端够刚度,内模刨光,以保证浇筑混凝土的平整度。钢筋密集部位振捣时更应特别加以注意,防止出现蜂窝、麻面,否则将不平的地方抹平;②把防水堵漏剂与自来水拌合成糊状,用瓦工工具或刮板刮平。硬化后喷水湿养护。(4)施工注意事项。①把防水堵漏剂和自来水按照1:0.3-0.35比例,迅速拌合成浆体,低于10℃时,采用40℃水搅拌;②把拌合好的胶泥放在手上感到烫手稍微发硬时,迅速按到漏水处,按三分钟后方可松手;③拌合时应少加水、勤加水,拌合均匀后不应在搅动,避免损失塑性,凝固后不可砸碎再用。
3.3.3焊接钢板。
在堵漏前砸出漏水点靠近基坑侧地连墙钢筋,在防水堵漏剂施工完成后,在其后方焊接加固钢板,把漏洞盖住,增强水确保钢板焊接完成后在其边缘再用堵漏剂进行密封,确保对漏洞的完整处理,不再渗水。
4结语实践证明,以上整治漏水方案得当,封堵后的漏水点不再渗水,适合沈阳地区地质情况。经济安全,可操作性强。如果渗水不大的情况,采用以上其中一种堵水方法即可。
Value Engineering ·207·
软基处理措施现状分析
The Analysis of Status Quo Soft Foundation Handling Measures
胡旭峰Hu Xufeng
(温岭市市政工程公司,温岭317500)
(Wenling Municipal Construction Co. ,Wenling 317500,China )
摘要:对于新建工程,原则上首先应考虑利用天然地基,对于淤泥和淤泥质土利用其上覆较好土层作为地基持力层,当上覆土层较薄,应注
意避免施工时对淤泥和淤泥质土的扰动;对于冲填、杂填建筑垃圾和性能稳定的工业废料,当均匀性和密实度较好时,均可利用作为地基持力层;
对于有机质含量较多的生活垃圾和对基础有腐蚀性的工业废料等杂填土,未经处理不宜作为地基持力层。
Abstract:For the new construction, using the natural foundation should be considered in principle firstly. For the silt and mud, it is better to use the fine soil as a foundation bearing stratum, when the cover is thin, we should avoid disturb construction of the silt and mud soil. As for the red fill, mixed fill and stable performance of construction waste and industrial waste, when the uniformity and density is better, they can be used as a foundation bearing stratum; for more organic content and the foundation of solid waste corrosive industrial waste and other miscellaneous fill, are not suitable for the foundation support layer.
关键词:软基处理;排水固结法;施工工艺
Key words:soft ground; drainage consolidation; construction technology
中图分类号:TU47
文献标识码:A
文章编号:1006-4311(2010)03-0207-02
1软基处理的一般原则
若地基软弱不能满足要求,则需进行处理,根据工程情况及地基土质条件或组成的不同,处理的目的可以是:
(1)提高土的抗剪强度,使地基保持稳定;)降低土的压缩性,使地基的沉降和不均匀沉降至允许范围(2内;
(3)降低土的渗透性或渗流的水力梯度,防止或减少水的渗漏,避免渗流造成地基破坏;
施加预应力时端部会出现局部应力集中压碎现象。
5预应力筋张拉
张拉工序是后张法预应力混凝土空心板梁施工的关键环节。当
(根据设计要求不同)后即可进混凝土强度达到设计强度75%~90%
行张拉工序。预应力钢材张拉前,应先调整到初应力σo ,再开始张拉
应加上初应力以下和量测伸拉值。实际伸长值除量测的伸长值外,
预应力钢材张拉时,应以伸长值进行校核。实际伸长的推算伸长值。
值与理论伸长值之差超过6%,应暂停张拉,待查明原因并采取措施加以调整后,方可继续张拉。因此,准确地测出张拉的实际伸长值是至关重要的。最初张拉时,由于各束预应力钢材松紧、弯直程度不一样,因此应力与应变不成正比,初应力时的伸长值不宜采用量测的方法,而应采用推算的方法。预制空心板梁的张拉机具多选用液压穿心式千斤顶和电动高压油泵,机具的型号要根据千斤顶的张拉力与行程应满足施工需要进行选择。使用前应对千斤顶、油压表进行配套标定,得到张拉力与压力表读致之间的正常关系曲线。张拉机
千斤顶与压力表必须配套使用。预制空心板梁大多采用具与锚具、
具有自锚性能的低松弛钢铰线,张拉时采用双向对称张拉法。后张法钢绞线张拉程序:自锚性低松弛力钢铰线0→初应力(σ)o →σo com (持荷5min 锚固) 张拉时采取“应力一应变”双控制度,采取分批对称张拉的原则。预应力筋在张拉预应力达到稳定后即可进行锚固。后张法预加应力实测项目如表2所示。
表2后张法预应力混凝土实测项目
(4)改善土的动力性能、防止地基产生震陷变形或因土的震动液化而丧失稳定性;
)消除或减少土的沉陷性或胀缩性引起的地基变形,避免建(5
筑物玻坏或影响其正常使用。
对单一工程来讲,处理目的可能是单一的,也可能需同时在几个方面达到一定要求:地基处理除用于新建工程的软弱和特殊土地基外,也作为事后补救措施用于已建工程地基加固。
2软土地基常用处理方法在张拉完毕4小时后应进行孔道压浆工作。预应力钢束孔道压浆的目的, 主要是防止预应筋锈蚀, 并通过凝结后的水泥浆将预应力传递至混凝土结构中. 对防锈蚀而言, 孔道压浆越早越好, 而且可防止力筋的松驰, 使构件尽快安装。施工过程中应注意事项。
(1)孔道应冲洗干净,再用空压机吹去孔内积水,锚具周围的间晾和孔洞应城封,以防冒浆。
(2)水泥浆的技术要求:①强度等级不宜低于42.5,水泥浆的强度不低于30MPa ;②水泥浆的水灰比一般为0.35~0.45;③水泥浆的泌水率最大不得超过3%,拌和后3小时,泌水率应控制在2%以内,24小时后泌水应全部被浆吸回;④水泥浆的稠度应控制在14~18之间;⑤水泥浆中掺入外掺剂后,其最大自由膨胀率应小于10%;⑥水泥浆拌和时间应不少于2min ,直至获得稠度均匀的水泥浆。
(3)压浆应缓慢、均匀,不得中断,压浆应使用活塞式压浆泵,压浆的最大压力宜控制在0.5~0.7MPa,当孔道较长时,最大压力宜为1MPa 。
(4)孔道压浆特别注意水灰比的控制及外加剂的使用,确保灌浆饱满。
(5)压浆时,每一工作班应留取不少于3组的70.7mm ×70.7mm ×70.7mm 立方体试件,标准养护28d ,检查其抗压强度,作为评定水泥浆质量的依据。某M40水泥浆配合比如表3。
表3M40水泥浆配合比表(kg/m3)
项次12345
检查项目规定值或允许偏差检查方法和频率规定分
11433
P.O4251269钦用水508RT 灌浆剂173—0.40
管道坐标梁长方向30抽查30%,每根查(mm )梁高方向1010个点管道间距同排10抽查30%,每根查(mm )上下层105处
张拉应力值符合设计要求查张拉记录张拉伸长率±6%查张拉记录断丝每束1根,不超过
查张拉记录钢束
滑丝数1%不允许
6孔道压浆
(6)封锚。
封锚在压浆完成后进行。封锚混凝土的强度应符合设计规定,并不得低于板梁混凝土的设计强度。封锚前应先将梁板端凿毛,并冲洗干净,然后绑扎端部钢筋网,浇筑封锚混凝土。必须严格控制封锚后的梁体长度。长期外露的锚具,还应采取防锈措施。不外露的锚具应被完全包裹在封锚混凝土中,并有一定的保护层厚度。封锚完毕后应注意及时养护。